HOME IMPROVEMENT Index
Appliances
Basement
Bathrooms
Bedrooms
Cleaning
Contractors
Doors
Driveways & Paths
Duct Tape
Electrical Systems
Family Room
Fences & Gates
Fireplace
Floor Coverings
Furniture
Handles, Knobs & Hinges
Help on the Homefront
Home Energy Efficiency
Home Office
Homeowner in Process
House Exterior
Indoor Pests
Kitchens
Lighting
Outdoor Equipment
Outdoor Structures
Painting
Plumbing
Safety
Sports-Related Additions
Staining
Stairs
Storage
Tools
Utility Room
Walls & Ceilings
Windows

BEST OF
HOME IMPROVEMENT
Flooring
Decks
Mold Quiz
Home Safety
Tiling Techniques
Lighting Solutions
Weekend Projects
DIY to the Rescue
Home Renovations
Bathroom Makeover
Kitchen Renovations
Ultimate Media Room
Be Your Own Contractor

SPONSOR LINKS

  • Entertainment Bar: Setting Pre-Cast Stones
  • From "Weekend Remodeling"
    episode WKR-310


    The framework is built, the electrical outlets are wired, and now it's time to begin adding pre-cast stone to the front of the bar.

    This project mixes many different elements (cabinetry, pre-cast stone, countertop installation) and requires carpentry, electrical and masonry skills. Because of this, this project rates 4 out of 5 on the Weekend Remodeling difficulty scale.

    advertisement


    PHOTO

    Before the Remodel: a basic basement with room for improvement.
    PHOTO

    After: From boring basement to family room with a dash of panache.
    Materials:

    2 x 4s
    2 electrical boxes and outlets
    Non-metallic building electrical wire
    Drywall and drywall "mud"
    1/2" cement board
    Wire mesh
    Mortar
    Pre-cast stone
    Cabinets
    Under counter refrigerator
    Various trim pieces
    Nails and screws
    Painting supplies
    2 granite countertops
    Steel mounting plates
    Hammer
    Circular saw
    Drill and bits
    Pliers
    Trim nailer
    Tape measure
    Electrical tester
    Wire strippers and wire nuts
    Utility knife
    Trowel
    Cardboard
    Grinder
    Level
    Shims
    Clamps
    Caulk gun and caulk
    Silicon adhesive
    Bucket
    T-square
    Chalk line
    Work gloves (for working with metal lathe)

    PHOTO

    Figure A
    PHOTO

    Figure B
    PHOTO

    Figure C
    PHOTO

    Figure D
    PHOTO

    Figure E
    PHOTO

    Figure F
    Note: This project was designed with the assistance of a computer design program. The instructions for your particular project may vary.

    1. Install 1/2" cement board to the front of the bar (figure A). Use a level to mark the location of the wall studs, then attach section of the cement boards using 1-1/4" screws to secure.

    2. To install metal lathe, set a section along the bottom of the bar, then attach through the cement boards and into the studs, using galvazined screws to secure.

    3. Cut the metal lathe with snips and make sure it overlaps (figure B) the previous piece (don't forget to use gloves when working with metal).

    4. Set top section into position, making sure this piece overlaps the bottom. Attach metal lathe as before, until entire area is covered. Cut away excess at top of wall.

    5. Mix mortar and begin setting stones. First apply a scratch coat of mortar onto metal lathe (figure C). Set corners of your design first, then work toward both ends. (In this example, Reveiz starts in the middle of the wall where the corners are located.)

    6. To set the pre-cast stones, butter the backs with mortar, then press the stones into the scratch coat (figure D). Alternate the way the stones overlap at the corner to break up the pattern and prevent a continuous seam from appearing.

    7. Set about half-way up the first corner, then move over the other corner and use a level to mark lines in to the mortar to give a guide from which to set stones. Use the edge of the trowel to edge the stones as needed to fit (figure E). Continue working until center section is complete.

    8. Next, it's time to scratch coat the short wall and scribe lines into the mortar. Set stones over to the end of the wall. In this design, the stones end at the back of the cabinet and are flush on the sides.

    9. Move to the long wall and repeat the process (figure F). On this wall, the straight pieces can be set without a lot of cuts.

  • ALSO IN THIS EPISODE: